Name:
NR TWI 2G033 ISSUE 1 PDF
Published Date:
03/01/2005
Status:
[ Active ]
Publisher:
Network Rail
Introduction
This Track Work Instruction covers the replacement of an end post (or ‘T’ piece) in a site made insulated joint in jointed track. See also separate instructions:
TWI 2C027 How to maintain insulated joints
TWI 2C037 How to carry out rail adjusting
TWI 2G035 How to recognise types of insulated joints
TWI 2G070 How to determine & carry out correct torque settings
TWI 2P027 How to maintain joints
End posts in CWR are covered by TWI 2G090
| Edition : | 1 |
| File Size : | 1 file , 75 KB |
| Number of Pages : | 5 |
| Published : | 03/01/2005 |