Name:
NR TWI 2G040 ISSUE 1 PDF
Published Date:
03/01/2005
Status:
[ Active ]
Publisher:
Network Rail
Introduction
This Track Work Instruction covers the removal of rail end lipping at insulated joints.
See also separate instructions:
TWI 2C027 How to maintain insulated joints
TWI 2G031 How to replace a insulated joint in CWR
TWI 2G032 How to replace and maintain an insulated joint in jointed track
TWI 2G035 How to recognise types of insulated joints
| Edition : | 1 |
| File Size : | 1 file , 55 KB |
| Number of Pages : | 3 |
| Published : | 03/01/2005 |