Name:
NR TWI 2G045 ISSUE 1 PDF
Published Date:
03/01/2005
Status:
[ Active ]
Publisher:
Network Rail
Introduction
This Track Work Instruction covers what track and traffic features to look out for in order to assist in the early recognition of rolling contact fatigue (RCF).
The term RCF covers a number of failures including gauge corner cracking (GCC).
See also separate instructions:
TWI 2G044 How to manage a defective rail
TWI 2P008 How to recognise rail defects
| Edition : | 1 |
| File Size : | 1 file , 160 KB |
| Number of Pages : | 4 |
| Published : | 03/01/2005 |