NR TWI 2G056 ISSUE 1 PDF

NR TWI 2G056 ISSUE 1 PDF

Name:
NR TWI 2G056 ISSUE 1 PDF

Published Date:
03/01/2005

Status:
[ Active ]

Description:

How to Dig a Cutter Bar Trench

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$5.7
Need Help?
PDF ONLY

Introduction

This Track Work Instruction covers the excavation of a cutter bar trench prior to ballast cleaning. It is assumed that the line is re-opened after the trench is dug.

See also separate instructions:

TWI 2B004 How to regulate ballast by hand

TWI 2B007 How to dig out contaminated ballast 


Edition : 1
File Size : 1 file , 69 KB
Number of Pages : 3
Published : 03/01/2005

History


Related products

NR T60161 ISSUE 2
Published Date: 10/07/2005
Lineside & on Track Equipment Typical Circuits Indicators - Right Away Indicator Acc: Electronic Interface (Pot/Laps) Peripheral Location Circuit
$5.7
NR NR/L3/MTC/RCS0216/SP11 ISSUE 2
Published Date: 03/03/2012
Risk Control Manual: Use of Jacks
$5.7
NR NR/L2/TEL/30036 ISSUE 4
Published Date: 08/26/2008
Booster Transformer Outages: Managing the Consequences for Telecommunication Systems
$13.2
NR BRS-SM 440/W1 ISSUE A
Published Date: 01/15/2015
Signalling Equipment Framework - Large Connector Panel for Apparatus Cases & REBs
$5.7

Best-Selling Products