Name:
NR TWI 2G056 ISSUE 1 PDF
Published Date:
03/01/2005
Status:
[ Active ]
Publisher:
Network Rail
Introduction
This Track Work Instruction covers the excavation of a cutter bar trench prior to ballast cleaning. It is assumed that the line is re-opened after the trench is dug.
See also separate instructions:
TWI 2B004 How to regulate ballast by hand
TWI 2B007 How to dig out contaminated ballast
| Edition : | 1 |
| File Size : | 1 file , 69 KB |
| Number of Pages : | 3 |
| Published : | 03/01/2005 |