Name:
NR TWI 2P020 ISSUE 1 PDF
Published Date:
03/01/2005
Status:
[ Active ]
Publisher:
Network Rail
Introduction
This Track Work Instruction covers how to measure and define the gap between the switch rail and the stock rail when the switch is in the open position.
See also separate instructions:
TWI 2S078 How to secure switches out of use
TWI 3S091 How to carry out Point care inspections
| Edition : | 1 |
| File Size : | 1 file , 59 KB |
| Number of Pages : | 2 |
| Published : | 03/01/2005 |