Name:
NR TWI 2P035 ISSUE 1 PDF
Published Date:
03/01/2005
Status:
[ Active ]
Publisher:
Network Rail
Introduction
This Track Work Instruction covers how to maintain steel sleepered track.
If this sort of track is installed correctly then there should be very little maintenance required.
This TWI covers those jobs that you may be required to do and how you should plan or report them.
See also the separate instruction:
TWI 2P034 How to change a steel sleeper
| Edition : | 1 |
| File Size : | 1 file , 59 KB |
| Number of Pages : | 2 |
| Published : | 03/01/2005 |