Name:
NR TWI 2S040 ISSUE 1 PDF
Published Date:
03/01/2005
Status:
[ Active ]
Publisher:
Network Rail
Introduction
This Track Work Instruction covers the maintenance of hand point mechanisms. Hand points are switches operated by direct control i.e. not by a Signaller. The mechanisms are usually attached to extended switch timbers.
This instruction does not cover ground frames. See also separate instructions:
TWI 2S039 How to install/replace/maintain a stretcher Bar
TWI 2S045 How to adjust a kicking strap
| Edition : | 1 |
| File Size : | 1 file , 98 KB |
| Number of Pages : | 4 |
| Published : | 03/01/2005 |