NR TWI 2S079 ISSUE 1 PDF

NR TWI 2S079 ISSUE 1 PDF

Name:
NR TWI 2S079 ISSUE 1 PDF

Published Date:
03/01/2005

Status:
[ Active ]

Description:

How to Provide Manual Assistance to S&C Tamping

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$5.7
Need Help?
PDF ONLY

Introduction

This Track Work Instruction covers how to provide manual assistance to an S&C tamper.

There is a common belief that because tampers are big powerful machines they are able to work without assistance. This is not true! It is important to understand what they can and cannot do.

Tampers are expensive machines that have to be used correctly. Track possessions obtained to enable them to work can be difficult to arrange.

For this reason it is essential that every provision is made to enable them to carry out the maximum amount of work. Therefore, you should provide the correct support both before they arrive and when they are working in order to make sure that they are used as efficiently as possible.

See also separate instructions:

TWI 2S006 How to tighten S&C fastenings

TWI 2T008 How to prepare track for tamping


Edition : 1
File Size : 1 file , 150 KB
Number of Pages : 4
Published : 03/01/2005

History


Related products

NR X39904 ISSUE 2
Published Date: 03/07/2015
Automatic Open Crossings Locally Monitored+B (AOCL+B) - Barrier Location - Fuse & Terminal Analysis & H/O Board Layout
$5.7
NR NR/L2/ELP/25001 ISSUE 1
Published Date: 09/02/2017
Electrical Safety Principles for New Electrification
$13.2
NR BRS-SM 323
Published Date: 05/01/1980
M3A Point Machine Modification to Circuit Controller
$5.7
NR NR/PS/TEL/00025 ISSUE 2
Published Date: 04/01/2006
Synchronous Digital Hierarchy Multiplexing Equipment
$13.2

Best-Selling Products

PDA PTC PUPSIT 1
Published Date: 02/01/2020
Points to Consider for Risks Associated with Sterilizing Grade Filters and Sterilizing Filtration
$97.5
PDA PTC PUPSIT 2
Published Date: 03/01/2020
Points to Consider for Implementation of Pre-Use Post-Sterilization Integrity Testing (PUPSIT)
$97.5
PDA TR 13-2
Published Date: 11/01/2020
Technical Report No. 13-2 Fundamentals of an Environmental Monitoring Program Annex 1: Environmental Monitoring of Facilities Manufacturing Low Bioburden Products
$97.5
PDA TR 13
Published Date: 06/01/2014
Technical Report 13 Revised, (TR 13) Fundamentals of an Environmental Monitoring Program
$97.5
PDA TR 13
Published Date: 04/22/2022
Technical Report 13 Revised 2022, (TR 13) Fundamentals of an Environmental Monitoring Program
$97.5
PDA TR 14
Published Date: 09/01/2008
PDA Technical Report No. 14 (TR 14) Validation of Column-Based Chromatography Processes for the Purification of Proteins
$97.5