Name:
NR TWI 2S081 ISSUE 2 PDF
Published Date:
02/01/2013
Status:
[ Active ]
Publisher:
Network Rail
Introduction
This track work information sheet explains how to correctly scope and change a half set of switches in jointed or CWR track. This process can also be used when changing a full set of switches.
This job requires work to be carried out by S&T staff and close cooperation and planning with them is needed. If replacing strengthened S&C, welding staff will also be required.
See also:
TWI 2S072 How to handle S&C
TWI 2S003 How to recognise switch types
Appendix 1: Scoping TEF
Appendix 2: TEF 3239
| Edition : | 2 |
| File Size : | 1 file , 640 KB |
| Number of Pages : | 16 |
| Published : | 02/01/2013 |