NR TWI 2S081 ISSUE 2 PDF

NR TWI 2S081 ISSUE 2 PDF

Name:
NR TWI 2S081 ISSUE 2 PDF

Published Date:
02/01/2013

Status:
[ Active ]

Description:

How to Change a Half Set of Switches on Timber Bearers

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

Introduction

This track work information sheet explains how to correctly scope and change a half set of switches in jointed or CWR track. This process can also be used when changing a full set of switches.

This job requires work to be carried out by S&T staff and close cooperation and planning with them is needed. If replacing strengthened S&C, welding staff will also be required.

See also:

TWI 2S072 How to handle S&C

TWI 2S003 How to recognise switch types

Appendix 1: Scoping TEF

Appendix 2: TEF 3239


Edition : 2
File Size : 1 file , 640 KB
Number of Pages : 16
Published : 02/01/2013

History


Related products

NR SMF/PL/0268 ISSUE 1
Published Date: 10/01/2007
Team Resource Hours Checklist
$5.7
NR NR/L3/TRK/003 ISSUE 43
Published Date: 06/03/2023
Index of Track Engineering Forms
$18.6
NR SMF/ENV/472 ISSUE 1
Published Date: 06/02/2012
Planned Environmental Inspection Form
$5.7
NR NR/L3/CIV/140/225C ISSUE 1B
Published Date: 03/01/1997
Model Clause 225C: Permanent Way Particular Specification (Plain Line Renewals)
$5.7

Best-Selling Products

AWWA 20385
Published Date:
Information Management and Technology (IMTECH) Conference: 1998 Proceedings on CD-ROM
AWWA 20391
Published Date:
Annual Conference and Exposition 1999 Proceedings