NR TWI 2S082 ISSUE 1 PDF

NR TWI 2S082 ISSUE 1 PDF

Name:
NR TWI 2S082 ISSUE 1 PDF

Published Date:
08/01/2013

Status:
[ Active ]

Description:

How to Repair a Common Crossing Nose and Wingrail Using BV1000

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
nr-twi-2s082-issue-1_2761096

Choose Document Language:
7.50 €
Need Help?
PDF ONLY

Introduction

This track work information sheet details how to scope and carry out a repair on a crossing using the BV1000 and Matweld grinder, it covers:

  • Scoping Defects

  • Repair of Nose & Wings

  • Reference to associated works 

  • Matweld grinder See also:

TEF 3009, TEF 3031 & TEF 3037 - appendix A


Edition : 1
File Size : 1 file , 1.4 MB
Number of Pages : 8
Published : 08/01/2013

History


Related products

NR NR/L3/ELP/3091/MODC ISSUE 1
Published Date: 09/07/2019
DC Conductor Rail Electrified Lines Working Instructions: Local Isolation Instructions
7.50 €
NR NR/L2/OHS/053 ISSUE 3
Published Date: 03/05/2022
Assessing the Risk of Stress in the Workplace
13.20 €
NR NR/L3/OPS/045/3.01 ISSUE 1
Published Date: 09/02/2017
National Operating Procedure (NOP) 3.01: Level Crossings - Keeping a Record of Telephone Calls
7.50 €
NR NR/L3/ELP/27240/NR/DIST C22D ISSUE 2
Published Date: 03/01/2017
Routine Maintenance of 33kV, 750MVA Metalclad Switchgear GEC Type KC
7.50 €

Best-Selling Products

UNE-CLC/TR 50373:2006 IN
Published Date: 06/07/2006
Wind turbines - Electromagnetic compatibility
UNE-CLC/TR 50453:2008 IN
Published Date: 11/26/2008
Evaluation of electromagnetic fields around power transformers
UNE-CLC/TR 50462:2009
Published Date: 10/14/2009
Rules for the determination of uncertainties in the measurement of the losses on power transformer and reactors
UNE-CLC/TR 50488:2007 IN
Published Date: 07/18/2007
Railway applications - Safety measures for the personnel working on or near overhead contact lines