Name:
NR TWI 2T012 ISSUE 1 PDF
Published Date:
12/01/2011
Status:
[ Revised ]
Publisher:
Network Rail
Introduction
This task covers the lifting & packing of track in plain line including adjustment switches. It includes using cross-levels, sighting boards, the opening out of part bays, the packing as required, refilling of the ballast crib and re-profiling the ballast.
| Edition : | 1 |
| File Size : | 1 file , 780 KB |
| Number of Pages : | 8 |
| Published : | 12/01/2011 |