NR TWI 3B011 ISSUE 1 PDF

NR TWI 3B011 ISSUE 1 PDF

Name:
NR TWI 3B011 ISSUE 1 PDF

Published Date:
03/01/2005

Status:
[ Active ]

Description:

How to Carry out Machine Reballasting

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$5.7
Need Help?
PDF ONLY

Introduction

This Track Work Instruction covers re-ballasting using excavators. It does not cover the use of mechanical Ballast Cleaners.

See also separate instructions:

TWI 3B003 How to understand blanket design

TWI 3B006 How to manage multiple wet bed formation


Edition : 1
File Size : 1 file , 55 KB
Number of Pages : 3
Published : 03/01/2005

History


Related products

NR NR/CIV/SD/524 ISSUE B
Published Date: 09/02/2017
Single Ring Re-Casing of Defective Brickwork in Tunnel Linings Up to Four Rings
$5.7
NR NR/SMS/PART/Z ISSUE 16
Published Date: 12/02/2023
Signal Maintenance Specifications (SMS): PART Z
$24.3
NR NR/L3/INI/PG115/PS/017 ISSUE 1
Published Date: 06/05/2010
Planning and Programme Controls: Earned Value Reporting - Guidance on Set Up and Maintenance of Primavera Schedules
$13.2
NR NR/SMTH/PART 02 ISSUE 13
Published Date: 12/02/2023
Signal Maintenance Testing Handbook (SMTH): Part 02
$24.3

Best-Selling Products

PCA DX074D
Published Date:
High Strength Bars as Concrete Reinforcement, Part 6. Fatigue Tests
PCA DX093D
Published Date:
Fatigue Tests of Reinforcing Bars
PCA DX139P
Published Date:
Influence of Aggregate Properties on Effectiveness of Interlock Joints in Concrete Pavements
PCA DX145D
Published Date:
Fatigue Tests of Reinforcing Bars-Effect of Deformation Pattern
PCA EB001.15
Published Date: 2011
Design and Control of Concrete Mixtures, 15th edition
PCA EB001.16
Published Date: 2016
Design and Control of Concrete Mixtures, 16th edition