Name:
NR TWI 3B018 ISSUE 1 PDF
Published Date:
03/01/2005
Status:
[ Active ]
Publisher:
Network Rail
Introduction
This Track Work Instruction covers the appropriate use of geotextiles to stabilise formation problems.
See also separate instructions:
TWI 2B003 How to prepare trial holes
TWI 2B012 How to maintain drains
TWI 2B013 How to inspect drainage
TWI 3B003 How to design a blanket
TWI 3B006 How to manage multiple wet bed formation
TWI 3B010 How to assess the condition of ballast/trial holes/specify ballast depth
TWI 3T034 How to formulate a strategy to stabilise and improve track condition
| Edition : | 1 |
| File Size : | 1 file , 52 KB |
| Number of Pages : | 2 |
| Published : | 03/01/2005 |