NR TWI 3C026 ISSUE 1 PDF

NR TWI 3C026 ISSUE 1 PDF

Name:
NR TWI 3C026 ISSUE 1 PDF

Published Date:
03/01/2005

Status:
[ Active ]

Description:

How to Manage Dynamic Gauge Spread in Sleepered Track

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$5.7
Need Help?
PDF ONLY

Introduction

This Track Work Instruction covers how to manage sections of track where the gauge is spreading under traffic, but appears to be normal when not loaded.

See also separate instruction:

TWI 2G092 How to use a dynamic track gauge

TWI 2P022 How to maintain longitudinal timbers

TWI 3T012 How to maintain gauge


Edition : 1
File Size : 1 file , 60 KB
Number of Pages : 2
Published : 03/01/2005

History


Related products

NR BRS-SM 512/1 ISSUE B
Published Date: 04/23/1982
Rail Clamp Point Lock Adaptor Block for 95Lb BH Track
$5.7
NR NR/CIV/SD/561 ISSUE B
Published Date: 09/02/2017
Tunnels Shaft Liner Plates: Height of Repair Less than 5M: General Arrangement
$5.7
NR BRS-ST 88/7
Published Date:
Ladder Sides Frame Assembly Lifting Barrier (Auto) MK II
$5.7
NR NR/L3/CIV/140/111C ISSUE 2
Published Date: 12/01/2008
Model Clause 111C: Tightly Bonded Systems for Underline Bridges
$5.7

Best-Selling Products

FORD AWX
Published Date: 12/01/1993
WIRE, TAMPICO, AND SYNTHETIC FILAMENT POWER WHEEL BRUSHES APPLICATIONS AND GENERAL INFORMATION
$9
FORD B2BBX
Published Date: 09/01/1991
ONE-STEP PAINT LINE CLEANING PROCEDURE
$9
FORD B2F1
Published Date: 02/01/1978
ANODIC ELECTROCOATING SYSTEM CLEANING AND MAINTENANCE
$9
FORD B2GX
Published Date: 04/01/1984
PAINT BAKE OVENS CLEANING AND MAINTENANCE
$9
FORD BAX-1
Published Date: 07/01/1977
PAINT SPRAYING SYSTEMS, SMALL PARTS, AUTOMATIC
$9
FORD BAX-2
Published Date: 07/01/1985
PAINT SPRAY BOOTH BACK SECTION ACCEPTANCE TEST
$9