Name:
NR TWI 3G044 ISSUE 1 PDF
Published Date:
03/01/2005
Status:
[ Active ]
Publisher:
Network Rail
Introduction
This Track Work Instruction covers how to manage staff who are acting as watchmen in a variety of situations. This may include being used to monitor:
• Track that has a defect that is in danger of buckling or failing.
• The activities of others and the effects that others may have on the integrity of the railway
• Weak embankments or slips.
If you have a competent, well-briefed watchman on site, then you may prevent it to the extent where extreme remedial measures are required. See also the separate instruction: TWI 3G028 How to manage hot weather patrolling
| Edition : | 1 |
| File Size : | 1 file , 53 KB |
| Number of Pages : | 2 |
| Published : | 03/01/2005 |