Name:
NR TWI 3G066 ISSUE 1 PDF
Published Date:
03/01/2005
Status:
[ Active ]
Publisher:
Network Rail
Introduction
This Track Work Instruction covers how to install an S&C layout that has been built up and fitted with bearers off site. It applies to all types of materials.
This document summarises basic requirements only. A detailed methodology is described in the document “Installation of Switches and Crossings”.
| Edition : | 1 |
| File Size : | 1 file , 72 KB |
| Number of Pages : | 4 |
| Published : | 03/01/2005 |