Name:
NR TWI 3G077 ISSUE 1 PDF
Published Date:
03/01/2005
Status:
[ Active ]
Publisher:
Network Rail
Introduction
This Track Work Instruction covers the carrying out of maintenance of track with is not supported by ballast.
This can include direct fastenings on bridge decks or pit roads, and directly supported sleepered track.
See also separate instructions:
TWI 2G074 How to maintain slab track
TWI 2P021 How to recognise longitudinal timber deterioration
TWI 2P022 How to maintain longitudinal timbers
| Edition : | 1 |
| File Size : | 1 file , 79 KB |
| Number of Pages : | 3 |
| Published : | 03/01/2005 |