NR TWI 3P018 ISSUE 1 PDF

NR TWI 3P018 ISSUE 1 PDF

Name:
NR TWI 3P018 ISSUE 1 PDF

Published Date:
03/01/2005

Status:
[ Active ]

Description:

How to Manage Bullhead Track

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$5.7
Need Help?
PDF ONLY

Introduction

This Track Work Instruction covers how to manage bullhead track in the context of an area with mixed track types.

See also separate instructions:

TWI 2B016 How to maintain ash ballasted track

TWI 2C010 How to install and maintain bullhead keys

TWI 2P007 Identify rail section & steel

TWI 2P018 How to record track type

TWI 3G053 How to manage track quality

TWI 3P009 How to stress bull head CWR

TWI 3T034 How to formulate a strategy to stabilise and improve track condition


Edition : 1
File Size : 1 file , 55 KB
Number of Pages : 2
Published : 03/01/2005

History


Related products

NR NR/L2/CTM/012/035 ISSUE 1
Published Date: 03/06/2010
Sig 35: Install and configure signalling power supply systems
$5.7
NR NR/L2/SIG/30014/C410 ISSUE 3
Published Date: 06/02/2012
Signal Works Testing Error Reporting
$13.2
NR NR/L3/ELP/29987/MOD01 ISSUE 9
Published Date: 06/03/2023
Working on or About 25 kV A.C. Electrified Lines: General Requirements
$13.2
NR NR/L2/CIV/1000/08 ISSUE 2
Published Date: 06/01/2024
Competence Management for Asset Protection and Optimisation (ASPRO)
$18.6

Best-Selling Products

NIRMA CM 1.0-2007
Published Date: 01/01/2000
American National Standard for Guidelines for Configuration Management of Nuclear Facilities