Name:
NR TWI 3P071 ISSUE 1 PDF
Published Date:
03/01/2005
Status:
[ Active ]
Publisher:
Network Rail
Introduction
This Track Work Instruction covers the situation where there is heavy sidewear and a need to replace a short piece of rail - such as between points ’A’ and ‘B’ in the photograph. This could happen if it was necessary to remove a rail defect or replace an IBJ. This will require the railhead profile of the new rail to be ‘blended’ to that of the existing rail. A B
See also the separate instructions:
TWI 3G055 How to carry out reprofiling of the railhead
TWI 3G123 Use and maintenance of small plant
| Edition : | 1 |
| File Size : | 1 file , 56 KB |
| Number of Pages : | 2 |
| Published : | 03/01/2005 |