NR TWI 3P071 ISSUE 1 PDF

NR TWI 3P071 ISSUE 1 PDF

Name:
NR TWI 3P071 ISSUE 1 PDF

Published Date:
03/01/2005

Status:
[ Active ]

Description:

How to Change a Defective Rail on a Heavily Sideworn Curve

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$5.7
Need Help?
PDF ONLY

Introduction

This Track Work Instruction covers the situation where there is heavy sidewear and a need to replace a short piece of rail - such as between points ’A’ and ‘B’ in the photograph. This could happen if it was necessary to remove a rail defect or replace an IBJ. This will require the railhead profile of the new rail to be ‘blended’ to that of the existing rail. A B

See also the separate instructions:

 TWI 3G055 How to carry out reprofiling of the railhead

TWI 3G123 Use and maintenance of small plant


Edition : 1
File Size : 1 file , 56 KB
Number of Pages : 2
Published : 03/01/2005

History


Related products

NR NR/CIV/SD/1371 ISSUE G
Published Date: 09/02/2017
U-Type Underbridges: Waterproofing: Details
$5.7
NR NR/L3/OPS/045/3.29 ISSUE 1
Published Date: 09/02/2017
National Operating Procedure (NOP) 3.29: Ground Frame Local Instructions
$5.7
NR BRS-SM 2328/2 ISSUE B
Published Date: 01/17/1994
Electric Point Machine Fittings Left Hand Drive Rod for UIC Point Layouts Fitted with Electric Point Machines
$5.7
NR NR/L3/MTC/RCS0216/GA18 ISSUE 2
Published Date: 03/03/2012
Risk Control Manual: Working with on Track Machines
$5.7

Best-Selling Products

Q52-98 Lockout/Tagout Video
Published Date: 03/15/1998