NR TWI 3S082 ISSUE 1 PDF

NR TWI 3S082 ISSUE 1 PDF

Name:
NR TWI 3S082 ISSUE 1 PDF

Published Date:
03/01/2005

Status:
[ Active ]

Description:

How to Replace a Soleplate

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$5.7
Need Help?
PDF ONLY

Introduction

This Track Work Instruction covers the replacement of a soleplate on a timber bearer. (If a soleplate on a concrete bearer is damaged it is likely that the bearer will also be seriously damaged.)

Soleplates under switches that are controlled by signallers (as above) can only be replaced with the assistance from qualified signalling staff.

Soleplates in hand operated switches - such as freight or goods yards - do not need the help of signal engineering staff.

See also separate instructions:

TWI 2S013 How to change a crossing timber

TWI 2S039 How to install, replace and maintain a stretcher bar

TWI 2S045 How to adjust a kicking strap


Edition : 1
File Size : 1 file , 93 KB
Number of Pages : 3
Published : 03/01/2005

History


Related products

NR NR/L3/ELP/27240/NR/DIST C22P ISSUE 2
Published Date: 03/01/2017
Routine Maintenance of ABB. 11kV and 22kV SF6 Circuit Breakers Type "SAFESIX" and Associated Equipment within the Circuit Breaker Cubicle
$5.7
NR E10000/7/11 ISSUE A
Published Date: 03/01/1993
Signal Control Circuits - Double Compound Indications WR Ind on HW (WR) Panels Historical
$7.5
NR NR/L2/SIG/30014/D120/TS6-11 ISSUE 5
Published Date: 09/03/2022
Signalling Works Testing Handbook: Mechanically Operated Point End Signalling Works Test Specification
$7.5
NR TI 021 ISSUE 1
Published Date: 12/11/2001
Tool Kit for Tightening Hardlock Nuts on Corus RT60 Adjustable Stretcher Bars
$7.5

Best-Selling Products

NMEA 0183
Published Date: 01/01/2002
NMEA Standard for Interfacing Marine Electronic Devices, Version 3.01