Name:
NR TWI 3S087 ISSUE 1 PDF
Published Date:
03/01/2005
Status:
[ Active ]
Publisher:
Network Rail
Introduction
A Run-Through will occur when a vehicle travels over trailing switches that are set against it. This Track Work Instruction covers how to make repairs after a set of points or switch diamonds, have been run through. It also outlines the type of damage that is likely to occur.
See also the separate instruction:
TWI 3S062 How to manage a defective switch/stock rail
| Edition : | 1 |
| File Size : | 1 file , 52 KB |
| Number of Pages : | 2 |
| Published : | 03/01/2005 |