Name:
NR TWI 3T030 ISSUE 1 PDF
Published Date:
03/01/2005
Status:
[ Active ]
Publisher:
Network Rail
Introduction
This Track Work Instruction gives particular guidance on the maintenance of curves on high line speeds, which do not use the system of absolute track geometry. Network Rail Company Specifications lay down the tolerances relating to line speeds and must be followed according to the appropriate speed band and line category.
See also separate instructions:
TWI 2T001 How to permanently mark out a curve for tamping
TWI 3T004 How to remove an overshot curve
TWI 3T005 How to design sluing
TWI 3T010 How to set out a curve
WI 3T023 How to maintain a transition
| Edition : | 1 |
| File Size : | 1 file , 61 KB |
| Number of Pages : | 3 |
| Published : | 03/01/2005 |