Name:
NR TWI 3T043 ISSUE 1 PDF
Published Date:
03/01/2005
Status:
[ Active ]
Publisher:
Network Rail
Introduction
This Track Work Instruction covers how to slue the track (move it sideways) by mechanical means.
See also separate instructions:
TWI 2T021 How to slue track manually
TWI 3G090 How to use PUMs, PLUMs, PEMs or LEMs TWI 3T005 How to design sluing
TWI 3T022 How to plan & carry out sluing
TWI 3T030 How to maintain a high speed curve
| Edition : | 1 |
| File Size : | 1 file , 49 KB |
| Number of Pages : | 3 |
| Published : | 03/01/2005 |