2-C7 - Ventilation Effectiveness of Alternating Façade-integrated Ventilation Devices in a Dwelling PDF

2-C7 - Ventilation Effectiveness of Alternating Façade-integrated Ventilation Devices in a Dwelling PDF

Name:
2-C7 - Ventilation Effectiveness of Alternating Façade-integrated Ventilation Devices in a Dwelling PDF

Published Date:
2022

Status:
Active

Description:

Publisher:
ASHRAE

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$4.8
Need Help?
Ventilation systems are designed based on the air flow volume required to ventilate the room, the same applies to façade-integrated ventilation devices operating in alternating mode, also referred to as push-pull devices. Those rather small devices represent a simple way to provide fresh air and air-to- air heat recovery for residential dwellings. The present research aims to analyse the ventilation effectiveness of push-pull devices experimentally. Hence, a tracer gas analysis is performed in a residential building. The experimental object is a storey of a residential building consisting of four rooms each equipped with one façade-integrated ventilation device. Three of these operate in alternating mode performing a regenerative heat recovery, while the fourth is an exhaust only device. The measurements are carried out during summer and winter to investigate the influence of the varying climate boundary conditions. In order to evaluate the ventilation effectiveness, the age of air is determined based on the concentration decay method applying CO2 as a tracer gas. For the evaluation the air exchange efficiency εa in the breathing zone at 1.7 m height was applied. As a conclusion it was found that push-pull devices can provide a mixed ventilation characteristic although there are trends for a vulnerability to pressure and temperature differences between the in- and outdoor surroundings, which lead to ventilation short circuits.
File Size : 1 file , 1.4 MB
Note : This product is unavailable in Russia, Belarus
Number of Pages : 11
Product Code(s) : D-IAQ2020-C2-C07
Published : 2022
Units of Measure : Dual

History


Related products


Best-Selling Products

NG AMBP 051
Published Date: 09/01/2010
Asset Management Business Procedure - The Implementation of Construction (Design & Management) Regulations (CDM) 2007. Delivery of Asset Management Maintenance Delivery Electricity Minor Schemes
$138
NG AMBP 051
Published Date: 08/01/2015
Asset Management Business Procedure - Implementation of Construction (Design & Management) Regulations (CDM) 2015. Delivery of ETAM Operation Projects and Temporary Works Coordination for Construction
$138
NG AMBP 130
Published Date: 06/01/2018
Asset Management Business Procedure - Management of OHL Work in ETO Operations
$138
NG AMBP 130
Published Date: 02/01/2011
Asset Management Business Procedure - Guidance for Planning of Work on or Near to High Voltage Overhead Lines
$138
NG AMBP 136
Published Date: 10/01/2013
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
NG AMBP 136
Published Date: 01/01/2015
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
$138