Name:
2001 ASHRAE Technology Awards: Hybrid Chilled Water Plant PDF
Published Date:
2001
Status:
Active
Publisher:
ASHRAE
The central chilled water (CHW) plant was not meeting the needs of Capital University's 1.2 million-ft 2 (111 480 m 2 ) campus in Columbus, Ohio. Failure of one of the two 750-ton (2638 kW), 35-year-old single-stage steam absorption chillers caused the university to rent a chiller during summer 1998.
CHW loads were expected to increase due to a soon-to-be-built 126,000-ft 2 (11 705 m 2 )sports and recreation facility and the air conditioning of other campus buildings. The cooling towers and other ancillary equipment were degraded. The constant-flow CHW pumping system and lack of controls at each of the 10 buildings on the system resulted in wasted energy and comfort problems. The university's natural gas contract provided a monetary incentive for consuming 30% of the annual gas consumption during the summer months. An analysis showed that upgrading the central plant was the most cost-effective option. A life-cycle cost analysis was done to select the best central plant system. The design firm then designed and led the turnkey (i.e., design/build) replacement of the old central chiller plant with a new hybrid plant, consisting of the following:
The entire system retrofit was completed by May 1, 1999 at a cost of $2.1 million and has been operating flawlessly since that time (almost two full cooling seasons).
| File Size : | 1 file , 540 KB |
| Note : | This product is unavailable in Russia, Belarus |
| Number of Pages : | 2 |
| Product Code(s) : | D-5985 |
| Published : | 2001 |