Name:
2004 ASHRAE Technology Awards: Underfloor Air System for Retrofit Office Complex PDF
Published Date:
2005
Status:
Active
Publisher:
ASHRAE
When the HVAC design of the Hamilton Landing project was first conceived in 1998, it consisted of large package air-cooled rooftop units sitting next to the historic hangars with a conventional overhead VAV reheat system.
| File Size : | 1 file , 360 KB |
| Note : | This product is unavailable in Russia, Belarus |
| Number of Pages : | 3 |
| Product Code(s) : | D-25927 |
| Published : | 2005 |