Name:
2008 ASHRAE Technology Award Winner: Rehabilitating Health-Care Facility PDF
Published Date:
2008
Status:
Active
Publisher:
ASHRAE
A deficient building envelope resulted in serious mold contamination at Honoré-Mercier Hospital, a 37-year-old, 300-bed health-care center near Montreal. This article explains how the complete renovation project used enthalpy wheels and run-around coils, which recover heat from exhaust air, along with a zoning strategy to achieve a 47% reduction in energy use. The hospital consumed less energy after the project’s completion even though 90,000 ft2 of space was added to the building. The designers won a first-place ASHRAE Technology Award.
Units: Dual
| File Size : | 1 file , 2.8 MB |
| Note : | This product is unavailable in Russia, Belarus |
| Number of Pages : | 4 |
| Product Code(s) : | D-AJ08Mar02 |
| Published : | 2008 |