3301 -- Economic Preferred Window Orientation and Optimum Fenestration Design of a Non-Daylit and Daylit Large Office Building for Different Climatic Conditions and Different Billing Structures PDF

3301 -- Economic Preferred Window Orientation and Optimum Fenestration Design of a Non-Daylit and Daylit Large Office Building for Different Climatic Conditions and Different Billing Structures PDF

Name:
3301 -- Economic Preferred Window Orientation and Optimum Fenestration Design of a Non-Daylit and Daylit Large Office Building for Different Climatic Conditions and Different Billing Structures PDF

Published Date:
1990

Status:
Active

Description:

Publisher:
ASHRAE

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$4.8
Need Help?

Investigates the economically optimum window size and orientation for a daylit and non-daylit high-rise office building. Considers the effect of environmental variations on the building performance, of various energy charging schemes on life cycle cost and their effect on the optimum fenestration design. Notes a computer program using multiple regression techniques, numerical optimisation algorithms and building simulation results, to determine the optimum window design for a daylit or non-daylit building for the climatic locations studied. Concludes for optimisations for Boston, Denver and Saskatoon that the lowest life cycle cost building will be daylit with electric lighting controls, in all except cold, northerly sites. Describes how window orientation strongly affects life cycle costs. Provides recommendations. Does not consider non-quantifiable architectural factors.

 

KEYWORDS: Windows, offices, computer programs, calculating, designing, orientation.


File Size : 1 file , 1.3 MB
Note : This product is unavailable in Russia, Belarus
Number of Pages : 11
Product Code(s) : D-18342
Published : 1990

History


Related products


Best-Selling Products

NG AMBP 051
Published Date: 09/01/2010
Asset Management Business Procedure - The Implementation of Construction (Design & Management) Regulations (CDM) 2007. Delivery of Asset Management Maintenance Delivery Electricity Minor Schemes
$138
NG AMBP 051
Published Date: 08/01/2015
Asset Management Business Procedure - Implementation of Construction (Design & Management) Regulations (CDM) 2015. Delivery of ETAM Operation Projects and Temporary Works Coordination for Construction
$138
NG AMBP 130
Published Date: 06/01/2018
Asset Management Business Procedure - Management of OHL Work in ETO Operations
$138
NG AMBP 130
Published Date: 02/01/2011
Asset Management Business Procedure - Guidance for Planning of Work on or Near to High Voltage Overhead Lines
$138
NG AMBP 136
Published Date: 10/01/2013
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
NG AMBP 136
Published Date: 01/01/2015
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
$138