3986 -- Laboratory Evaluations of Ozone as a Scale Inhibitor for Use in Open Recirculating Cooling Systems PDF

3986 -- Laboratory Evaluations of Ozone as a Scale Inhibitor for Use in Open Recirculating Cooling Systems PDF

Name:
3986 -- Laboratory Evaluations of Ozone as a Scale Inhibitor for Use in Open Recirculating Cooling Systems PDF

Published Date:
1996

Status:
Active

Description:

Publisher:
ASHRAE

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$4.8
Need Help?

Reports on a pilot cooling tower apparatus closely simulating the operations of a typical light industrial cooling water system and a HVAC system which was set up to study the scaling of heat transfer tubes in the presence of 0.1 ppm concentration of ozone. Running times ranged from 432 hours to 1,800 hours. Finds that at 0.1 ppm ozone concentration, the ozone has little effect on the scaling behaviour of heat exchanger copper tubes. The traditional forces that cause scaling are still the dominant factors regardless of the presence of ozone (at a 0.1 ppm level.

KEYWORDS: year 1996, Ozone, antiscale, scaling, laboratory testing, experiment, copper, tubes, heat exchangers, cooling, water


File Size : 1 file , 900 KB
Note : This product is unavailable in Russia, Belarus
Product Code(s) : D-16369
Published : 1996

History


Related products


Best-Selling Products

NG AMBP 051
Published Date: 09/01/2010
Asset Management Business Procedure - The Implementation of Construction (Design & Management) Regulations (CDM) 2007. Delivery of Asset Management Maintenance Delivery Electricity Minor Schemes
$138
NG AMBP 051
Published Date: 08/01/2015
Asset Management Business Procedure - Implementation of Construction (Design & Management) Regulations (CDM) 2015. Delivery of ETAM Operation Projects and Temporary Works Coordination for Construction
$138
NG AMBP 130
Published Date: 06/01/2018
Asset Management Business Procedure - Management of OHL Work in ETO Operations
$138
NG AMBP 130
Published Date: 02/01/2011
Asset Management Business Procedure - Guidance for Planning of Work on or Near to High Voltage Overhead Lines
$138
NG AMBP 136
Published Date: 10/01/2013
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
NG AMBP 136
Published Date: 01/01/2015
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
$138