4001 -- Development of Ventilation Rates and Design Information for Laboratory Animal Facilities. Part 2 - Laboratory Tests PDF

4001 -- Development of Ventilation Rates and Design Information for Laboratory Animal Facilities. Part 2 - Laboratory Tests PDF

Name:
4001 -- Development of Ventilation Rates and Design Information for Laboratory Animal Facilities. Part 2 - Laboratory Tests PDF

Published Date:
1996

Status:
Active

Description:

Publisher:
ASHRAE

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$4.8
Need Help?

Reports on the study of eight ventilation parameters (room air exchange rate, diffuser neck diameter, diffuser type, number of returns, return location, cage type, room size and cage rack arrangement) for laboratory animal facilities in a full-scale room ventilation simulator. Air exchange rates, velocities and temperatures within the room and the cages were studied. Finds that cage type was the most important factor affecting cage conditions. The remaining factors did not significantly affect cage conditions in the ranges studied. Summarises the results in tables.

KEYWORDS: year 1996, Ventilation, laboratories, animal housing, experiment


File Size : 1 file , 1.6 MB
Note : This product is unavailable in Russia, Belarus
Product Code(s) : D-16414
Published : 1996

History


Related products


Best-Selling Products

CII BMM2001-10
Published Date:
Impacts of Design/Information Technology on Building and Industrial Projects
$36
CII BMM2002-10
Published Date: 11/01/2002
Measuring the Impacts of the Delivery System on Project Performance -- Design-Build and Design-Bid-Build
$36
CII BMM2002-3
Published Date: 02/01/2002
Benchmarking and Metrics Summary Report for 2001
$36
CII BMM2004-10
Published Date: 10/01/2004
Best Practices for Project Security
$36
CII BMM2006-10
Published Date: 07/01/2006
Lessons Learned in the Implementation of Best Practices for Project Security
$36
CII BMM2006-11
Published Date: 11/01/2006
Impacts of Automation and Integration Technologies on Project and Company Performance
$36