AB-10-C010 -- Cooling Efficiency in Contained Applications Using Intelligent Controls PDF

AB-10-C010 -- Cooling Efficiency in Contained Applications Using Intelligent Controls PDF

Name:
AB-10-C010 -- Cooling Efficiency in Contained Applications Using Intelligent Controls PDF

Published Date:
2010

Status:
Active

Description:

Publisher:
ASHRAE

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$4.8
Need Help?

Two of the biggest challenges in data centers today are the increasing heat density of the IT equipment and the energy required to operate and cool that equipment. In order to operate efficiently while dealing with these increasing loads, many best practices must be incorporated. Best practices such as arranging racks in hot-aisle/cold-aisle configurations covering all unused rack space with blanking panels, and sealing all cable cutouts in the raised floor must be done to accomplish effective and efficient cooling. This paper will go beyond these basic requirements to look at the effect of using aisle containment in conjuntion with the necessary monitoring and control of the cooling system to provide a more efficient cooling system. This is accomplished by controlling both the supply air temperature and airflow to align the cooling system with the rack temperature and airflow requirements. Comparisons between several scenarios will be made.

 


File Size : 1 file , 420 KB
Note : This product is unavailable in Russia, Belarus
Number of Pages : 8
Product Code(s) : D-AB-10-C010
Published : 2010

History


Related products


Best-Selling Products

NG AMBP 051
Published Date: 09/01/2010
Asset Management Business Procedure - The Implementation of Construction (Design & Management) Regulations (CDM) 2007. Delivery of Asset Management Maintenance Delivery Electricity Minor Schemes
$138
NG AMBP 051
Published Date: 08/01/2015
Asset Management Business Procedure - Implementation of Construction (Design & Management) Regulations (CDM) 2015. Delivery of ETAM Operation Projects and Temporary Works Coordination for Construction
$138
NG AMBP 130
Published Date: 06/01/2018
Asset Management Business Procedure - Management of OHL Work in ETO Operations
$138
NG AMBP 130
Published Date: 02/01/2011
Asset Management Business Procedure - Guidance for Planning of Work on or Near to High Voltage Overhead Lines
$138
NG AMBP 136
Published Date: 10/01/2013
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
NG AMBP 136
Published Date: 01/01/2015
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
$138