AN-92-09-4 -- Description of Supply Openings in Numerical Models for Room Air Distribution PDF

AN-92-09-4 -- Description of Supply Openings in Numerical Models for Room Air Distribution PDF

Name:
AN-92-09-4 -- Description of Supply Openings in Numerical Models for Room Air Distribution PDF

Published Date:
1992

Status:
Active

Description:

Publisher:
ASHRAE

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$4.8
Need Help?

The velocity level in a room with jet ventilation is strongly influenced by the supply conditions. The momentum flow in the supply jet controls the air movement in the room, and it is therefore, very important that the inlet conditions and the numerical method can produce a sufficient description of this momentum flow. Discusses the following types of boundary conditions at supply openings - Direct description, where the boundary conditions are located at the surface of the air terminal device. Box method, where the boundary conditions are located at the surface of a box at some distance from the air terminal device. Prescribed velocity method, where some of the variables are described analytically inside a volume in front of the air terminal device and the rest of the variables are predicted by the numerical method. Computer-generated supply conditions, where the flow in the air terminal device is studied as a first step in the predictions of flow in the whole room. Includes new results from the IEA Annex 20 work.

KEYWORDS: rooms, air distribution, calculating, jets, ventilation, air inlets, air movement, air flow, air terminals, air flow rate, computer controls, diffusers, recirculating


File Size : 1 file , 1.1 MB
Note : This product is unavailable in Russia, Belarus
Product Code(s) : D-18030
Published : 1992

History


Related products


Best-Selling Products

CII BMM2001-10
Published Date:
Impacts of Design/Information Technology on Building and Industrial Projects
$36
CII BMM2002-10
Published Date: 11/01/2002
Measuring the Impacts of the Delivery System on Project Performance -- Design-Build and Design-Bid-Build
$36
CII BMM2002-3
Published Date: 02/01/2002
Benchmarking and Metrics Summary Report for 2001
$36
CII BMM2004-10
Published Date: 10/01/2004
Best Practices for Project Security
$36
CII BMM2006-10
Published Date: 07/01/2006
Lessons Learned in the Implementation of Best Practices for Project Security
$36
CII BMM2006-11
Published Date: 11/01/2006
Impacts of Automation and Integration Technologies on Project and Company Performance
$36