AT-78-03-2 (RP-70) -- Laboratory Fume Hoods: Part 2--Influence of Room Air Supply PDF

AT-78-03-2 (RP-70) -- Laboratory Fume Hoods: Part 2--Influence of Room Air Supply PDF

Name:
AT-78-03-2 (RP-70) -- Laboratory Fume Hoods: Part 2--Influence of Room Air Supply PDF

Published Date:
1978

Status:
Active

Description:

Publisher:
ASHRAE

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$4.8
Need Help?

Air supply fixtures, such as wall grilles or registers, ceiling diffusers or perforatedceiling panels affect the performance of laboratory fume hoods. Using amodification of a previously described performance test (1), the effect of varioussupply fixtures on laboratory fume hood performance was examined.


File Size : 1 file , 800 KB
Note : This product is unavailable in Russia, Belarus
Number of Pages : 16
Product Code(s) : D-AT-78-03-2
Published : 1978

History


Related products


Best-Selling Products

NPES ANSI B65.3
Published Date: 01/01/2001
SAFETY STANDARD FOR GUILLOTINE PAPER CUTTERS, MILL TRIMMERS AND INTEGRAL HANDLING EQUIPMENT
NPES B65-1
Published Date: 01/01/2011
Graphic technology – Safety requirements for graphic technology equipment and systems – Part 1: General requirements
$27.3
NPES B65-1
Published Date: 01/01/1995
Safety Standard - Printing Press Systems
NPES B65-2
Published Date: 01/01/1999
Safety Standard for Binding and Finishing Systems
NPES B65-2
Published Date: 01/01/2011
Graphic technology – Safety requirements for graphic technology equipment and systems – Part 2: Prepress and press equipment and systems
$21.3
NPES B65-3
Published Date: 01/01/2011
Graphic technology – Safety requirements for graphic technology equipment and systems – Part 3: Binding and finishing equipment and systems
$22.5