Name:
AT-90-01-3 -- Transient Response of Fixed-Area Refrigerant Expansion Devices PDF
Published Date:
1990
Status:
Active
Publisher:
ASHRAE
A test set-up is described and data have been obtained on the response of a capillary tube and a plug orifice to a step change in refrigerant flow conditions. The transient data exhibited response times on the order of 3 to 5 minutes for the capillary tube and 30 to 40 seconds for the plug orifice. The effects of these differing response times on the transient response of a complete system may or may not be insignificant. They are not considered at this time.
KEYWORDS: refrigerants, plugs, capillary tubes, orifices, tubes, R22.
| File Size : | 1 file , 390 KB |
| Note : | This product is unavailable in Russia, Belarus |
| Number of Pages : | 5 |
| Product Code(s) : | D-18460 |
| Published : | 1990 |