AT-90-11-2 -- Errors in Audit Prediction of Commercial Lighting and Equipment Loads and Their Impacts on Heating and Cooling Estimates PDF

AT-90-11-2 -- Errors in Audit Prediction of Commercial Lighting and Equipment Loads and Their Impacts on Heating and Cooling Estimates PDF

Name:
AT-90-11-2 -- Errors in Audit Prediction of Commercial Lighting and Equipment Loads and Their Impacts on Heating and Cooling Estimates PDF

Published Date:
1990

Status:
Active

Description:

Publisher:
ASHRAE

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$4.8
Need Help?

Uses a sample of 13 buildings that have received energy audits and are instrumented to collect end-use metered data to illustrate the uncertainty and range of errors in end-use loads predicted by energy audits in commercial buildings. The analysis focuses on audit prediction of pre-retrofit annual lighting and miscellaneous equipment loads and their impacts on the heating and cooling load estimates. Finds that the mean errors are in the order of 20% to 40%, which suggests the need for further analysis of more fundamental thermal analysis errors.

KEYWORDS: Buildings, USA, energy auditing, accuracy, commercial, lighting, heat load, cooling load.


File Size : 1 file , 1.3 MB
Note : This product is unavailable in Russia, Belarus
Number of Pages : 10
Product Code(s) : D-18491
Published : 1990

History


Related products


Best-Selling Products

ANL CNSV-TM-190
Published Date: 01/01/1990
Users Guide to Diane Version 2.1: A Microcomputer Software Package for Modeling Battery Performance in Electric Vehicle Applications