AT-96-01-2 -- Commissioning a Museum and Archival Storage Facility PDF

AT-96-01-2 -- Commissioning a Museum and Archival Storage Facility PDF

Name:
AT-96-01-2 -- Commissioning a Museum and Archival Storage Facility PDF

Published Date:
1996

Status:
Active

Description:

Publisher:
ASHRAE

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$4.8
Need Help?

Describes the post-construction HVAC system commissioning process undertaken at a new 425,000ft2 museum and archival storage facility. The commissioning agent was not brought into the process until construction was complete, the building was occupied and the HVAC systems were found to be functioning improperly. Describes the process of identifying the causes of system problems, performing verification tests, correcting problems and working to recreate a team approach to problem solving. Concludes with a discussion of how involving an agent throughout the design and construction process as recommended in ASHRAE Guideline 1 would have benefited all parties.

KEYWORDS: year 1996, Case studies, USA, museums, new buildings, building services, archives, commissioning


File Size : 1 file , 790 KB
Note : This product is unavailable in Russia, Belarus
Product Code(s) : D-16558
Published : 1996

History


Related products


Best-Selling Products

NAR CDG
Published Date:
Contest Directors Guide
$2.7
NAR CMASSPB
Published Date:
CMASS Plan Book
$3.6
NAR ED-12
Published Date:
Lower Tropospheric Probe
$1.2
NAR ED-20
Published Date:
Model Rocket Classroom Activities
$3
NAR ED-25
Published Date:
Rocketry Electrical Projects
$1.8
NAR GCCC
Published Date:
Guide to Competition for the Casual Competitor
$2.4