BA-92-08-4 -- Commissioning by Committee PDF

BA-92-08-4 -- Commissioning by Committee PDF

Name:
BA-92-08-4 -- Commissioning by Committee PDF

Published Date:
1992

Status:
Active

Description:

Publisher:
ASHRAE

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$4.8
Need Help?

Presents a case history of commissioning a direct digital control/facilities control and monitoring (DDC/FCMS) in a new multi-building complex. A major international airline constructed a new maintenance base at the new Alliance Airport in Fort Worth, Texas. The facility consists of eight major buildings totalling 1,750,000 ft2 and five smaller facilities plus all of the utilities required to operate the facility. All the buildings used DDC controls with pneumatic operators for valves and dampers. The FCMS connects to all buildings through fibre optic cabling located in an underground duct structure. Most of the buildings were operational by October 1991 and the first aircraft was moved into the hangar then, more that two months ahead of schedule. The commissioning process was handled by a committee made up of the airline project manager, the consulting engineer and the testing and balancing firm.

KEYWORDS: Commissioning, case studies, USA, airports, controls, computer controls, monitoring


File Size : 1 file , 1.6 MB
Note : This product is unavailable in Russia, Belarus
Product Code(s) : D-17902
Published : 1992

History


Related products


Best-Selling Products

AAMI/IEC 601219E
Published Date: 03/27/2012
Erratum for Medical electrical equipment - Part 2-19: Particular requirements for basic safety and essential performance of baby incubators
Free Download
AAMI/IEC 601220E
Published Date: 03/27/2012
Erratum for Medical electrical equipment - Part 2-20: Particular requirements for basic safety and essential performance of transport incubators
Free Download
AAMI/IEC 60601-1-12:2016/A1:2021
Published Date: 03/20/2022
Amendment 1, Medical electrical equipment - Part 1-12: General requirements for basic safety and essential performan - Collateral standard: Requirements for medical electrical equipment and medical electrical systems intended for use in the emergency medical services environment
$38.7
AAMI/IEC 60601-1-12:2016 & A1:2021
Published Date: 08/22/2022
Medical electrical equipment - Part 1-12: General requirements for basic safety and essential performance - Collateral standard: Requirements for medical electrical equipment and medical electrical systems intended for use in the emergency medical services environment CONSOLIDATED EDITION
$85.2
AAMI/IEC 60601-1-12:2016
Published Date: 10/06/2016
Medical electrical equipment - Part 1-12: General requirements for basic safety and essential performan - Collateral standard: Requirements for medical electrical equipment and medical electrical systems intended for use in the emergency medical services environment
$82.5
AAMI/IEC 60601-1-2:2007/(R)2012
Published Date: 05/15/2007
Medical electrical equipment - Part 1-2: General requirements for basic safety and essential performance - Collateral standard: Electromagnetic compatibility - Requirements and tests
$56.1