BA-92-09-4 -- Field Test of a Vertical Ground-Coupled Heat Pump in Alabama PDF

BA-92-09-4 -- Field Test of a Vertical Ground-Coupled Heat Pump in Alabama PDF

Name:
BA-92-09-4 -- Field Test of a Vertical Ground-Coupled Heat Pump in Alabama PDF

Published Date:
1992

Status:
Active

Description:

Publisher:
ASHRAE

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$4.8
Need Help?

This project was undertaken to determine the acceptability and operational characteristics of vertical ground-coupled heat pumps in southern climates. Summarises the cooling and heating performance of an installation in a 1,600-ft (150-m2) residence in Alabama (Kavanaugh and Deerman 1989). The system was installed in May 1988. The heating and cooling loads of the 30-year-old structure were 43,000 (13 kW) and 32,000 Btu/h (10 kW) respectively. The water-to-air heat pump operated 10% below rated efficiency in cooling and 15% below efficiency in heating. However, energy use and demand were substantially reduced. Based on the local 1989 residential rate structures, the average monthly utility bill was 83 dollars, with a high of 98.15 dollars (February) and a low of 66.65 dollars (June). The system replaced an 80,000-Btu/h horizontal gas furnace and a 9.6 SEER split-system cooling unit (ARI 1987). Annual savings were 217 dollars, resulting in a seven-year simple payback based on a 1,500 dollars added cost. Had the unit operated at rated efficiency, the savings would be 244 dollars a year with a simple payback of 6.1 years. Payback would be 10.2 years based on 2,500 dollars system added cost. Although the month of January was much milder than normal, August and September were warmer. Overall, both the test year and the preceding comparison year were close to normal in terms of total load placed on the heating and cooling system. The system also has a levelling effect on demand and monthly energy use. The heat pump operated at mid-range efficiency during periods of peak demand on the utility grid. Demand for hot water is substantially reduced on very hot and cold days, since a heat recovery unit was used. While cost savings were very good an additional 20% to 30% reduction is possible with the improved water-to-air heat pumps that are now available.

KEYWORDS: testing, site testing, vertical, soil heat pumps, heat pumps, USA, cooling, heating, performance, case studies, payback period, costs, economics, water air heat pumps, energy consumption, domestic, energy conservation, comparing, heat load, cooling load, heat recovery


File Size : 1 file , 1 MB
Note : This product is unavailable in Russia, Belarus
Product Code(s) : D-17913
Published : 1992

History


Related products


Best-Selling Products

ASD-STAN prEN 2002-003
Published Date: 12/01/1975
Test methods for metallic materials - Part 3 : Load calibration of tensile testing machines
$2.616
ASD-STAN prEN 2002-006
Published Date: 01/31/2000
Metallic materials - Test methods - Part 6 : Bend testing
$25.179
ASD-STAN prEN 2002-017
Published Date: 05/31/1991
Test methods for metallic materials - Tube used under pressure - Part 17 : Integrity test
$2.616
ASD-STAN prEN 2002-018
Published Date: 05/31/1991
Test methods for metallic materials - Part 18 : Hydraulic distension test for tube
$5.232
ASD-STAN prEN 2002-020
Published Date: 02/29/1996
Test methods for metallic materials - Part 20: Eddy current testing of circular cross-section tubes
$22.563
ASD-STAN prEN 2002-021
Published Date: 01/31/2000
Metallic materials - Test methods - Part 21 : Radiographic testing of castings
$8.502