BN-97-09-2 -- The Memorial Tunnel Fire Ventilation Test Program: The Longitudinal and Natural Tests PDF

BN-97-09-2 -- The Memorial Tunnel Fire Ventilation Test Program: The Longitudinal and Natural Tests PDF

Name:
BN-97-09-2 -- The Memorial Tunnel Fire Ventilation Test Program: The Longitudinal and Natural Tests PDF

Published Date:
1997

Status:
Active

Description:

Publisher:
ASHRAE

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$4.8
Need Help?

Jet fans did not play a part in road tunnel ventilation in the United States until the Memorial Tunnel Fire Ventilation Test Program. This programme included a series of tests that evaluated the performance of longitudinal ventilation using jet fans under the influence of a fire. Fire heat release rates on the order of 10, 20, 50 and 100 megawatts (MW) were tested. The tests demonstrated that jet fans provide a positive means of smoke and temperature management in road tunnels. Presents the findings of the longitudinal (using jet fans) and natural ventilation (without mechanical ventilation) test series. The longitudinal ventilation issues that are discussed include tunnel air flow rates, critical velocity, fire effects on air flow, impact on fans downstream of the fire, the effect of fan response time, and the impact of vehicle silhouettes. The natural ventilation issues that are discussed include the impact of buoyancy-driven air flows, air temperature, and the degree of stratification of the smoke layers produced by 20- and 50-MW fires.

Units: Dual 

KEYWORDS: year 1997, Tunnels, smoke ventilation, fire, USA, testing, jets, fans, roads, motor cars, temperature, air temperature, air flow rate, natural ventilation, performance, measuring


File Size : 1 file , 1.9 MB
Note : This product is unavailable in Russia, Belarus
Number of Pages : 13
Product Code(s) : D-16684
Published : 1997

History


Related products


Best-Selling Products

UNE-CLC/TS 50131-2-2:2005 V2
Published Date: 09/14/2005
Alarm systems - Intrusion systems -- Part 2-2: Requirements for passive infrared detectors
UNE-CLC/TS 50131-2-3:2005 V2
Published Date: 09/14/2005
Alarm systems - Intrusion systems -- Part 2-3: Requirements for microwave detectors
UNE-CLC/TS 50131-2-4:2005 V2
Published Date: 09/14/2005
Alarm systems - Intrusion systems -- Part 2-4: Requirements for combined passive infrared and microwave detectors
UNE-CLC/TS 50131-2-5:2005 V2
Published Date: 09/14/2005
Alarm systems - Intrusion systems -- Part 2-5: Requirements for combined passive infrared and ultrasonic detectors
UNE-CLC/TS 50131-2-6:2005 V2
Published Date: 09/14/2005
Alarm systems - Intrusion systems -- Part 2-6: Requirements for opening contacts (magnetic)
UNE-CLC/TS 50131-3:2005 V2
Published Date: 09/14/2005
Alarm systems - Intrusion systems -- Part 3: Control and indicating equipment