CH-06-05-2 - Control with Building Mass— Part II: Simulation PDF

CH-06-05-2 - Control with Building Mass— Part II: Simulation PDF

Name:
CH-06-05-2 - Control with Building Mass— Part II: Simulation PDF

Published Date:
2006

Status:
Active

Description:

Publisher:
ASHRAE

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$4.8
Need Help?

Reductions in building peak electrical demand can be achieved by incorporating building-specific models of thermal dynamics into controllers that will implement short-term peakperiod curtailment of HVAC capacity or pre-cool the building prior to peak-period cutbacks to increase the magnitude and duration of the load reduction. The same building-specific model can be used to effect energy savings by providing optimal- start control or optimal-pre-cooling control during unoccupied hours. Control logic was developed for pre-cooling with a central HVAC plant equipped with an air-side economizer. Measurement-based estimates were made of chiller performance and internal-gains schedules. The general transient- thermal-response model of the companion paper (Armstrong et al. 2006) was then used to determine buildingspecific thermal response and estimate the seasonal benefits of several peak-shifting and night-cooling strategies in the office building. Simulations showed a 30% to 60% reduction in seasonal mechanical cooling loads in the office building due to night cooling.

Units: Dual


File Size : 1 file , 3.2 MB
Note : This product is unavailable in Russia, Belarus
Number of Pages : 12
Product Code(s) : D-27913
Published : 2006

History


Related products


Best-Selling Products

ASQ A3534-1-1993
Published Date: 01/01/1993
ANSI/ISO/ASQ Standard - Statistics - Vocabulary and Symbols - Probability and General Statistical Terms (Revision and Redesignation of ANSI/ASQ A1 and A2-1987)
$19.5
ASQ B1-B3-1996
Published Date: 02/26/1996
Guide for Quality Control Charts - Control Chart Method of Analyzing Data - Control Chart Method of Controlling Quality During Production - Includes B1, B2, and B3
$17.7
ASQ C1-1996
Published Date: 01/01/1996
Specifications of General Requirements for a Quality Program - SAME AS ANSI Z1.8-1971
$14.7
ASQ D1160-1995
Published Date: 01/01/1995
Formal Design Review
$14.7