CH-12-007 -- Net Zero Building Cluster Energy Systems Analysis for U.S. Army Installations PDF

CH-12-007 -- Net Zero Building Cluster Energy Systems Analysis for U.S. Army Installations PDF

Name:
CH-12-007 -- Net Zero Building Cluster Energy Systems Analysis for U.S. Army Installations PDF

Published Date:
2012

Status:
Active

Description:

Publisher:
ASHRAE

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$4.8
Need Help?

The Army is required by law (EPACT 2005, EISA 2007) to eliminate fossil fuel use in new and renovated facilities by 2030 and to reduce overall facility energy usage by 30% by 2015. Army policy is to achieve eight net zero energy pilot installations by 2020, 25 net zero energy installations by 2031, and for all installations to achieve net zero energy status by 2058.

Achieving Net Zero Energy (NZE) will only be possible if an optimum mix of demand reduction and renewable sources are put in place at a community (installation) or building cluster scale. The Army operates what are essentially small campuses, or clusters of buildings on its installations. The US Department of Energy (DOE) is focused on the national grid scale or on individual buildings, while the commercial focus is on retrofits to individual buildings. There are only few case studies worldwide that address dynamics of energy systems at the community scale, and to date, there is a lack of tools to perform that task. The building stock at most US Army installations is complex and includes a mix of high and low energy use buildings. Energy use in these buildings varies due to the different military mission and requirements for each building, installation growth and expansion, and soldier deployment. Achieving net zero energy economically at such installations will require a seamless blend of energy conservation in individual buildings and building systems automation, utility management and control, and power delivery systems that have the capability to offer integration of on-site power generation (including renewable energy sources).

This paper describes the Net Zero fossil fuel based energy optimization process and illustrates it with an example based on the results of study conducted for a cluster of buildings at Fort Irwin, CA. The integrated optimization process is being developed under the Army research and development project "Modeling Net Zero Installations - Energy (NZI-E)" and the International Energy Agency (IEA) Energy Conservation in Buildings and Community Systems (ECBCS) Annex 51. The process is stepped, beginning with the optimization of each building to achieve the most cost effective energy efficient optimization of building envelope and energy using systems. Then energy saving measures affecting the total building cluster are optimized taking advantages of the diversification between energy intensities, scheduling, and waste energy streams utilization. The energy demands of the resulting energy-use optimized cluster will require the minimum sized renewable energy system needed to make the building cluster Net Zero fossil fuel energy.


File Size : 1 file , 950 KB
Note : This product is unavailable in Russia, Belarus
Number of Pages : 16
Product Code(s) : D-CH-12-007
Published : 2012

History


Related products


Best-Selling Products

CAN/CSA-CEI/IEC 1000-1-1-97 (R2023)
Published Date: 01/18/2000
Electromagnetic Compatibility (EMC) - Part 1: General - Section 1: Application and Interpretation of Fundamental Definitions and Terms (Adopted CEI/IEC 1000-1-1:1992)
$37.8
CAN/CSA-CEI/IEC 1000-2-1-97 (R2023)
Published Date: 01/18/2000
Electromagnetic Compatibility (EMC) - Part 2: Environment - Section 1: Description of the Environment - Electromagnetic Environment for Low-Frequency Conducted Disturbances and Signalling in Public Power Supply Systems (Adopted CEI/IEC 1000- 2-1:1990) / Compatibilite electromagnetique (CEM) - Partie
$36.3
CAN/CSA-CEI/IEC 1160-96 (R2001)
Published Date: 05/03/2000
Formal Design Review (Adopted CEI/IEC 1160:1992) / Revue de conception formalisee (norme CEI/IEC 1160:1992 adoptee)
$31.5
CAN/CSA-CEI/IEC 1258-98 (R2002)
Published Date: 02/25/2000
Guidelines for the Development and Use of Medical Electrical Equipment Educational Materials (Adopted CEI/IEC 1258:1994, first edition) / Guide pour le developpement et l'utilisation des supports educatifs relatifs aux appareils electromedicaux (norme CEI/IEC 1258:1994 adoptee, premiere edition) **
CAN/CSA-CEI/IEC 1288-1-98 (R2012)
Published Date: 02/16/2000
Cardiac Defibrillators - Cardiac Defibrillators-Monitors - Part 1: Operation (Adopted CEI/IEC 1288-1:1993, first edition) / Defibrillateurs cardiaques - Moniteurs-defibrillateurs cardiaques - Partie 1: Fonctionnement (norme CEI/IEC 1288-1:1993 adoptee, premiere edition)
CAN/CSA-CEI/IEC 1288-2-98 (R2012)
Published Date: 02/16/2000
Cardiac Defibrillators - Cardiac Defibrillators-Monitors - Part 2: Maintenance (Adopted CEI/IEC 1288-2:1993, first edition) / Defibrillateurs cardiaques - Moniteurs-defibrillateurs cardiaques - Partie 2: Maintenance (norme CEI/IEC 1288-2:1993 adoptee, premiere edition)