CH-12-C036 -- Commissioning, Field Testing, and Maintenance of Fans for Life Safety Applications in Tunnels PDF

CH-12-C036 -- Commissioning, Field Testing, and Maintenance of Fans for Life Safety Applications in Tunnels PDF

Name:
CH-12-C036 -- Commissioning, Field Testing, and Maintenance of Fans for Life Safety Applications in Tunnels PDF

Published Date:
2012

Status:
Active

Description:

Publisher:
ASHRAE

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$4.8
Need Help?

Developing and executing a carefully considered commissioning, field testing, and maintenance program is critical to provide assurance that life safety fans will be available in the event of a fire emergency. This paper explores the manufacturer's recommended commissioning procedures, field testing protocols used to demonstrate system integrity and maintenance procedures to assure long term availability.


File Size : 1 file , 1.2 MB
Note : This product is unavailable in Russia, Belarus
Number of Pages : 5
Product Code(s) : D-CH-12-C036
Published : 2012

History


Related products


Best-Selling Products