CH-77-12-3 -- Energy Conservation: American Airlines Terminal, DFW Airport PDF

CH-77-12-3 -- Energy Conservation: American Airlines Terminal, DFW Airport PDF

Name:
CH-77-12-3 -- Energy Conservation: American Airlines Terminal, DFW Airport PDF

Published Date:
1977

Status:
Active

Description:

Publisher:
ASHRAE

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$4.8
Need Help?

The American Airlines Terminal occupies approximately one fourth of the terminal area at theDallas/Fort Worth Airport, the world's largest. The American Airlines Terminal ConcourseLevel stretches for about one half mile, with crew member facilities one level below and abaggage tunnel one level below that. In addition, a level above the concourse provides spacefor mechanical and electrical equipment and areas for executive offices and passenger lounge.

The building's mechanical and electrical systems were designed pre-energy crisis, but didinclude definite plans for energy conservation. When the Airport opened in January of 1974amid the Arab oil embargo, energy conservation was destined to become an important factor tothe operating personnel. As prices of fuel began to influence the cost of heating and coolingenergy and electric energy for the Terminal, American Airlines became more aware of the needfor energy conservation.

In February of 1975, thirteen months after the Airport opened, consulting engineers andoperating personnel were challenged to recommend and implement any changes that would effectivelyreduce energy consumption.

The comparisons made in this paper omit the first three and one half months of operationof the new facility. This allowed time to solve the typical facility start-up difficulties.


File Size : 1 file , 1 MB
Note : This product is unavailable in Russia, Belarus
Number of Pages : 10
Product Code(s) : D-CH-77-12-3
Published : 1977

History


Related products


Best-Selling Products

CS UK CAS01
Published Date: 01/01/2003
The provision of holes in reinforced concrete beams
$7.5
CS UK CAS02
Published Date: 01/01/2014
Suspended concrete floors: maximum size of pour allowable and location of construction joints
$6
CS UK CAS03
Published Date: 02/01/2014
Straightening and rebending reinforcement on site
$6
CS UK CAS04
Published Date: 01/01/2014
Congested reinforcement: effects on placing and compacting concrete
$6
CS UK CAS05
Published Date: 04/01/2014
Holding down bolts in concrete: Suggested design procedures to BS 8110-1
$7.5
CS UK CAS06
Published Date: 01/01/2003
Reinforcement ripple
$7.5