CH-85-14-1 -- High-Rise Office Building Fire Safety System-It Isn’t Just the Integration of the FMCS with the Fire Alarm System--Or Is It? PDF

CH-85-14-1 -- High-Rise Office Building Fire Safety System-It Isn’t Just the Integration of the FMCS with the Fire Alarm System--Or Is It? PDF

Name:
CH-85-14-1 -- High-Rise Office Building Fire Safety System-It Isn’t Just the Integration of the FMCS with the Fire Alarm System--Or Is It? PDF

Published Date:
1985

Status:
Active

Description:

Publisher:
ASHRAE

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$4.8
Need Help?

Today’s high-rise office building fire safety systems are much more than just the integra­tion of the energy management control system (EMCS) with the fire alarm system. Actually, fire alarm systems are not just “alarm systems,” since they activate the building fire safety systems in addition to providing early warning alarms to the building occupants. If the “alarm” function was all that was required of the fire alarm system, it would not be necessary to discuss the integration of the fire alarm. Since it is currently used to activate various fire safety systems, such as smoke control, and various pressurization and smoke exhaust systems, which involve fan systems that are part of the normal cooling and heating system controlled by the EMCS, the proper integration is a necessity. In addition, today’s fire alarm systems activate elevator recall, the door release system, release of halon gas, flashing exit signs, and many other integral parts of the fire safety system not associated with the HVAC or fan systems. This paper will discuss the entire integrated fire safety system requirements including the EMCS.

 


File Size : 1 file , 780 KB
Note : This product is unavailable in Russia, Belarus
Number of Pages : 6
Product Code(s) : D-CH-85-14-1
Published : 1985

History


Related products


Best-Selling Products

CAN/CSA-ISO/IEC/IEEE 12207:18 (R2023)
Published Date: 12/01/2018
Systems and software engineering - Software life cycle processes (Adopted ISO/IEC 12207:2008, second edition, 2008-02-01)
$71.4
CAN/CSA-ISO/IEC/IEEE 12207-2:21
Published Date: 07/01/2021
Systems and software engineering - Software life cycle processes - Part 2: Relation and mapping between ISO/IEC/IEEE 12207:2017 and ISO/IEC 12207:2008 (ISO/IEC/IEEE 12207-2:2020, IDT)
$63.6
CAN/CSA-ISO/IEC/IEEE 14764:22
Published Date: 09/15/2022
Software engineering - Software life cycle processes - Maintenance (Adopted ISO/IEC/IEEE 14764:2022, third edition, 2022-01)
$51
CAN/CSA-ISO/IEC/IEEE 15026-1:20
Published Date: 03/01/2020
Systems and software engineering - Systems and software assurance - Part 1: Concepts and vocabulary (Adopted ISO/IEC 15026-1:2013, first edition, 2013-11-01)
$45
CAN/CSA-ISO/IEC/IEEE 15026-4:22
Published Date: 03/01/2022
Systems and software engineering - Systems and software assurance - Part 4: Assurance in the life cycle
$51.6
CAN/CSA-ISO/IEC/IEEE 15289:20
Published Date: 07/01/2020
Systems and software engineering - Content of life-cycle information items (documentation) (Adopted ISO/IEC/IEEE 15289:2019, fourth edition, 2019-07)
$60