CH-85-16-3 -- Development of Computerized Control Strategies for a Large Chilled Water Plant PDF

CH-85-16-3 -- Development of Computerized Control Strategies for a Large Chilled Water Plant PDF

Name:
CH-85-16-3 -- Development of Computerized Control Strategies for a Large Chilled Water Plant PDF

Published Date:
1985

Status:
Active

Description:

Publisher:
ASHRAE

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$4.8
Need Help?

A minicomputer monitoring and control system is part of the HVAC system of a 1.4 million square foot commercial facility. The chiller system at the central plant consists of four 1250 ton centrifugal chillers, a six-cell cooling tower, five 100,000 gallon chilled water storage tanks, and associated pumps and piping.

 Computer models of the chilled water system were developed to study the energy conservation potentia1 of control strategies intended for the minicomputer control system. Empirica1 curve fits were used for all of the components except the cooling tower. An effectiveness model based on manufacturer’s data was used for the cooling tower. Comparisons of modeled performance with measured data showed good agreement both at the component and system levels.

Optimal control strategies for the number of chillers, cooling tower fan speeds, and condenser pump flow rates were developed. These resulted in an estimated combined savings of $4,400 a year. Demand limiting using the chilled water storage reduced annual peak demand by 161 kW and saved an additional $5,500. Reset of the chilled water set point saved an additional $4,400 for a total combined savings of $14,300.


File Size : 1 file , 1.2 MB
Note : This product is unavailable in Russia, Belarus
Number of Pages : 15
Product Code(s) : D-CH-85-16-3
Published : 1985

History


Related products


Best-Selling Products

HOLDEN ETPSL0026
Published Date: 11/01/2012
H Point Measurement
$23.4
HOLDEN ETPSL0039
Published Date: 05/01/2012
ADR 21/00 Instrument Panel Impact Test Procedure
$23.4
HOLDEN ETPSL0044
Published Date: 11/01/2012
Demisting of Vehicle Windscreen for Categories MA MC ADR 15
$23.4
HOLDEN ETPSL0101
Published Date: 05/01/2012
Closure Stiffness Testing
$23.4
HOLDEN ETPSLR0008
Published Date: 11/01/2012
Door Weatherstrip Slam Test
$23.4
HOLDEN ETPSLR0061
Published Date: 11/01/2012
Steering Gear Impact Test
$23.4