CH-89-13-6 -- Commissioning: An Owner's Approach for Effective Operations PDF

CH-89-13-6 -- Commissioning: An Owner's Approach for Effective Operations PDF

Name:
CH-89-13-6 -- Commissioning: An Owner's Approach for Effective Operations PDF

Published Date:
1989

Status:
Active

Description:

Publisher:
ASHRAE

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$4.8
Need Help?

This paper outlines the approach to building systems commissioning that has evolved at a major British Columbia building owner/operator. The goals of this corporation for commissioning are twofold: first, to reduce construction deficiencies so systems actuallyfunction as designed, and second, to improve operator familiarity with systems to keep them working properly.

This approach to commissioning requires the owner, the designer, and the contractor to all assume certain responsibilities. The owner must define the overall scope of work, including commissioning, with his designer. The owner also has a responsibility to ensure that operators obtain the knowledge necessary for effective ongoing operation. The designer must properly define commissioning work in the tender documents and follow through with verification. The contractor must be responsible for the total installation, which includes carrying out functional performance tests of systems to allow verification of proper functioning.


File Size : 1 file , 700 KB
Note : This product is unavailable in Russia, Belarus
Number of Pages : 5
Product Code(s) : D-24622
Published : 1989

History


Related products


Best-Selling Products

Industrial Ventilation Workbook
Published Date: 01/01/2003