Name:
CH-93-05-3 -- The Commissioning Process - How it Affects the Building Owner and Maintenance Contractor PDF
Published Date:
1993
Status:
Active
Publisher:
ASHRAE
Discusses the effects of the commissioning process on the long-term operations and maintenance of heating, ventilation and air conditioning systems in buildings. Deals with the construction process, testing, balancing and controls, documentation and training. Concludes by noting that ASHRAE GPC-1 has produced a commissioning guideline.
KEYWORDS: Commissioning, maintenance, operations, heating, ventilation, air conditioning.
| File Size : | 1 file |
| Note : | This product is unavailable in Russia, Belarus |
| Number of Pages : | 4 |
| Product Code(s) : | D-18193 |
| Published : | 1993 |