CH-95-16-4 --Computer Simulation of Ventilation Strategies for Maintaining an Acceptable Indoor Air Quality in Office Buildings PDF

CH-95-16-4 --Computer Simulation of Ventilation Strategies for Maintaining an Acceptable Indoor Air Quality in Office Buildings PDF

Name:
CH-95-16-4 --Computer Simulation of Ventilation Strategies for Maintaining an Acceptable Indoor Air Quality in Office Buildings PDF

Published Date:
1995

Status:
Active

Description:

Publisher:
ASHRAE

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$4.8
Need Help?

Evaluates the effects of various ventilation strategies on contaminant distribution in a 22-storey office building for two events - 1. a partial renovation event, when a part of an occupied building is renovated and 2. a scheduled shutdown event, when the HVAC systems are shutdown during a holiday or a weekend. A multizone air and contaminant flow model was used to predict contaminant distribution. The model calculates pressures, air flows, and the time-varying contaminant concentration in the zones of a tall building. For a partial renovation event, the ventilation strategies included venting the renovated zone using window(s), a stairwell, a smoke control shaft, and mechanical exhaust. For a scheduled shutdown event, typical building operation was assumed with no specific source zone in the building. The objective of the computations was to determine the required start-up time of the HVAC system to diminish accumulated pollutant concentration in the building following a scheduled shutdown. Computations were conducted for winter, spring, and summer outdoor conditions. The effectiveness of various ventilation strategies for minimising the spread of the contaminant from the renovated zone to the surrounding areas depends on the location of the renovated zone with respect to the neutral pressure plane in the building. For the building used in the study, based on an outdoor air supply rate of 0.94 ACH, a four-hour start-up of the HVAC operation is adequate to diminish accumulated pollutant concentration in the building after a scheduled shutdown.

KEYWORDS: year 1995, calculating, ventilation, air quality, indoor, offices, air pollution, air flow, pressure, content, shutdown periods, building services, air infiltration, mechanical ventilation


File Size : 1 file , 840 KB
Note : This product is unavailable in Russia, Belarus
Product Code(s) : D-17229
Published : 1995

History


Related products


Best-Selling Products

UNE-ISO/TS 10004:2010 EX
Published Date: 09/29/2010
Quality management. Customer satisfaction. Guidelines for monitoring and measuring
UNE-ISO/TS 14167:2007 EX
Published Date: 12/19/2007
Gas analysis -- General quality assurance aspects in the use of calibration gas mixtures - Guidelines (ISO/TS 14167:2003)
UNE-ISO/TS 14256-1:2007 EX
Published Date: 09/05/2007
Soil quality -- Determination of nitrate, nitrite and ammonium in field-moist soils by extraction with potassium chloride solution -- Part 1: Manual method (ISO/TS 14256-1:2003)
UNE-ISO/TS 16949:2002
Published Date: 09/30/2002
Quality management systems. Particular requirements for the application of ISO 9001:2000 for automotive production and relevant service part organizations.
UNE-ISO/TS 16949:2004 ERRATUM
Published Date: 05/14/2004
Quality management systems. Particular requirements for the application of ISO 9001:2000 for automotive production and relevant service part organizations
UNE-ISO/TS 16949:2009
Published Date: 12/16/2009
Quality management systems. Particular requirements for the application of ISO 9001:2008 for automotive production and relevant service part organizations.