CH-99-09-3 -- Cooling Loads in Laboratories PDF

CH-99-09-3 -- Cooling Loads in Laboratories PDF

Name:
CH-99-09-3 -- Cooling Loads in Laboratories PDF

Published Date:
1999

Status:
Active

Description:

Publisher:
ASHRAE

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$4.8
Need Help?

The heating, ventilating, and air-conditioning (HVAC) system for a laboratory must be designed with consideration for safety, air cleanliness, and space temperature. The primary safety concern is to ensure proper coordination between fume hood exhaust and makeup air supply. Air cleanliness is maintained by properly filtering supply air, by delivering adequate room air changes, and by ensuring proper pressure relationships between the laboratory and adjacent spaces. Space temperature is maintained by supplying enough cooling air to offset the amount of heat generated in the room. Each of these factors must be considered, and the one that results in the largest ventilation rate is used to establish the supply and exhaust airflows. The project described in this paper illustrates a case where cooling load is the determining factor in the sizing of the air systems.

Units: I-P


File Size : 1 file , 490 KB
Note : This product is unavailable in Russia, Belarus
Number of Pages : 6
Product Code(s) : D-7587
Published : 1999

History


Related products


Best-Selling Products

TMS 1002-08
Published Date: 01/01/2008
A Transition Guide from the 2005 to the 2008 MSJC
$6
TMS 1222-17
Published Date: 2018
Masonry Basics, 2nd Edition
$10.5
TMS 1409-18
Published Date: 2018
Masonry Structures: Behavior and Design, 4th Edition
$54
TMS 1700-17
Published Date: 2017
Guide for Condition Assessment of Masonry Facades, 2017
$6
TMS 216-07
Published Date: 06/01/2007
Determining Fire Resistance - Concrete and Masonry (ACI 216.1-07 / TMS-0216-07)
$15.6