Name:
Commissioning: Hospital Retrocommissioning PDF
Published Date:
2010
Status:
Active
Publisher:
ASHRAE
The commissioning project of Mercy Hospital in Fort Scott, Kan., cost $207,789. It was projected to save $181,310 each year. Actual annual energy savings are $389,000. Simultaneous heating and cooling costs associated with high minimum airflow rates and improper control sequences were the most significant problems.
Units: Dual
| File Size : | 1 file , 150 KB |
| Note : | This product is unavailable in Russia, Belarus |
| Number of Pages : | 3 |
| Product Code(s) : | D-AJ10MayC |
| Published : | 2010 |